As of April 7, 2011 Rotating Power-Cut Schedule Applicable to Industrial Clients Cancelled

Wednesday - 20/07/2011 06:04
According to the Ministry of Trade and Industry’s directions concerning “Power supply plans in April, May and June 2011” and the directions of EVN and of Southern Power Corporation concerning “Power supply plans in April”, Dong Nai Power Company will cancel the rotating power-cut schedule applicable to industrial clients.

HTML clipboard 65A4B149DD0F46A5A6CBAA231F23281A .ExternalClassF82862EFE82B4FA6BCC778AD7E446E50 p.MsoNormal { margin-bottom:.0001pt; font-size:12.0pt; font-family:'Times New Roman'; margin-left:0cm; margin-right:0cm; margin-top:0cm; } 65A4B149DD0F46A5A6CBAA231F23281A .ExternalClassF82862EFE82B4FA6BCC778AD7E446E50 span.longtext { }

From April 7 to 30, 2011, the electricity clients on the rotating power-cut list (according to Document no.425/PCDN6) are allowed to use electricity for production seven weekdays as usual.

After that, Dong Nai Power Company will make a timely announcement based on how the national grid works.

Reported by Duy Binh, Translated by Duy Minh

Author: phongvien

Newer articles

Older articles

You did not use the site, Click here to remain logged. Timeout: 60 second